How to Review P&IDs: A 30-Point Checklist for Process Engineers

A bad P&ID costs you during commissioning. A P&ID review that catches the bad P&ID saves you during commissioning.

I've reviewed hundreds of P&IDs. I've seen vent valves pointing down (they fill with condensate). I've seen check valves drawn backwards (they check nothing). I've seen control valves with no block-and-bypass arrangement (plant shutdown to replace a $500 valve). Every one of these mistakes made it through at least two rounds of internal review before it reached me.

The problem isn't that engineers are careless. The problem is that P&ID review is treated as a visual check instead of a systematic process. Someone glances at the drawing, thinks "looks about right," and stamps it. Six months later, construction RFIs pile up, and someone says "this should have been caught in design review."

This article is a 30-point checklist for reviewing P&IDs — organized by what actually goes wrong, not by what's easy to check.


Before You Start: The Three-Layer Review

A P&ID review has three layers. Most teams only do the first one.

Layer What You're Checking Who Does It Time per P&ID
1. Completeness Is everything shown that should be? Process engineer (self-check) 15-30 min
2. Correctness Is what's shown actually right? Peer reviewer / senior engineer 30-60 min
3. Operability Can this actually be operated, maintained, and started up? Operations representative + process engineer 30-60 min

If you skip Layer 3, you'll find out what you missed during commissioning. Commissioning is the most expensive time to find design errors.


Layer 1: Completeness Checklist (12 Points)

These are the things that should be on the drawing. If they're not, the drawing isn't ready for review.

1. Drawing Borders and Title Block

2. Line Numbering

3. Equipment Tagging

4. Instrument Tagging

5. Valve Tagging

6. Notes and Hold Clouds


Layer 2: Correctness Checklist (10 Points)

This is where you find mistakes that will cause things not to work.

Advertisement

7. Flow Direction and Line Routing

8. Valve Orientation and Accessibility

9. Instrument Placement

10. Material and Specification Breaks

11. Redundancy and Sparing


Layer 3: Operability Checklist (8 Points)

This is the layer that separates experienced engineers from CAD operators. You can only review operability if you've operated something. If you haven't, bring someone who has.

12. Startup and Shutdown

13. Normal Operation

14. Maintenance Access

15. Emergency Conditions


How to Run a P&ID Review (The Process, Not Just the Checklist)

Step 1: Print It

Yes, print it. On paper. At least A3 size. A P&ID review on a screen misses things — the human eye scans a printed drawing differently than a zoomed-in monitor view. This is not superstition. I've personally caught flow arrow errors on paper that I missed three times on screen.

Step 2: Review Alone First

Before the group review, the reviewer spends 30-60 minutes alone with the drawing and: - The process description / design basis - The equipment list - The line list - The cause-and-effect matrix (for interlock checks)

Mark up the drawing with red pen. Write questions in the margin. The group review is for resolving questions, not for finding them.

Step 3: Walk the Process

Starting at the main feed inlet, trace every possible flow path: 1. Normal operation path 2. Startup path (bypasses, recirculation lines) 3. Shutdown path (drains, vents, isolation points) 4. Emergency path (relief valves, ESDVs, depressurization)

If you find a line that you can't trace from beginning to end, you've found an error or omission. A line that goes to a piece of equipment and stops without an outlet is not a complete line.

Step 4: Cross-Check Every Item

Go down the equipment list: is every item shown on a P&ID? Go down the valve list: is every valve shown? Go down the instrument list: is every instrument shown?

Missing items mean the lists are wrong or the drawings are wrong. Either way, that discovery is the purpose of the review.

Step 5: The Operations Walk-Through

Bring in someone who will actually operate the plant. Not the design manager. Not the project engineer. An operator or a commissioning engineer. Walk them through a typical shift:

If they hesitate, point to a valve that doesn't exist, or ask "where's the drain?" — you've found an operability issue.


Common P&ID Mistakes I've Seen (And What They Cost)

Mistake Consequence Cost to Fix After Construction
Check valve drawn backward Flow blocked on startup; pipe section must be cut and re-welded $5,000-15,000
Missing high-point vent Gas pocket prevents pump priming; line must be hot-tapped $3,000-8,000
Control valve with no bypass Plant shutdown required to replace CV trim; production loss $50,000-200,000 (downtime)
Relief valve discharge to atmosphere at grade level Safety incident; relocation of discharge piping $10,000-30,000
Flow meter with insufficient straight run Inaccurate measurement forever; meter relocation $15,000-40,000
Missing drain between isolation valves Maintenance personnel open strainer under pressure; safety incident $2,000-5,000 + potential injury
Pipe spec break in wrong direction Corrosion failure; pipe replacement $20,000-100,000
Level instrument range doesn't match vessel operating range Incorrect level reading; potential overflow or pump cavitation $5,000-20,000

These are not hypothetical. I have seen every single one of these on real projects. The total cost of P&ID errors on a medium-sized project ($50M) is typically $200,000-500,000 in field modifications. A thorough P&ID review costs $5,000-15,000 in engineering time. The ROI math is not complicated.


Tools That Make P&ID Review Faster

Tool What It Does Recommendation
Bluebeam Revu PDF markup with measurement tools, overlay comparison, comment tracking Industry standard for P&ID review. Worth the license.
AutoCAD P&ID / Plant 3D Built-in validation: line numbers, tag consistency, connectivity checks Use the "Check Drawing" function before exporting.
Smart Plant P&ID (Hexagon) Rule-based validation engine, auto-tagging, consistency across sheets Enterprise tool. Overkill for small projects.
Red pen on paper The original, still unbeaten for discovering flow logic errors Print at A3. You will find things you missed on screen.
P&ID Symbol Library Pre-drawn ISA-5.1 standard symbols for consistency Available in our templates pack.

The One Rule That Matters

A P&ID review is not complete until someone has traced every line from its origin to its destination.

Not "skimmed." Not "looked at." Traced. With their finger on the paper. Every branch. Every valve. Every instrument. Every possible flow path.

If you do this for every line on every drawing, you will catch 95% of P&ID errors before construction. If you don't, the construction team will catch them for you — at ten times the cost.

Print the drawing. Get a red pen. Start at the first line on the left. Trace it until it ends. Then do the next one.

That's the whole checklist, really. The 30 points above are just reminders of what to look for while you're tracing.